June 11, 2022|
Post by: admin
ACD 14/XXL12M
ACD 14 Flow Up 100 m3/min. NORMAL WORKING PROCEDURE Condensate is passed through inlet into container. Condensate will fill container causing operator to rise. Once operator has met maximum capacity, a magnet will open the pilot valve allowing condensate to be released through outlet. As condensate is released, the operator will move back to original [...]